True Tier 4 Colo in Phoenix, AZ Full Cab @ $1300

OpticIP has recently partnered with CyrusOne and operate out of their Chandler, AZ facility. This facility is a certified TIA 942 Class 4 data center, meaning power and cooling redundancy is priority. We offer 2N and N+1 power configurations for any power setup needed. This is the perfect location to host mission critical infrastructure for your company. We are offering amazing deals that are unheard of for a certified TIA 942 Class 4 datacenter. Sign up today, or contact us for more information.

Current Specials

Full Cabinet (48U) w/10 Mbps Unmetered - $1300/mo - NO SETUP FEES!!!
Full Cabinet (48U) w/100 Mbps Unmetered - $1600/mo - NO SETUP FEES!!!

Cabinet Specs:
  • 48U Cabinet
  • 110v/30amp A+B power
  • /26 IPv4
  • On-Site Remote Hands 24/7

*Additional power, bandwidth, and service plans available.*

Single Server Colocation available: 1U $199.95/mo, no setup fees

  • 5 IPv4 IPs
  • 100 MBPS PORT
  • $0 SETUP

Additional U's - $25/U/mo

Call/Contact for additional details, pricing, and availability.

Key Features of the Phoenix/Chandler CyrusOne Data Center
  • Largest data center in the state 1,000,000 sq. ft. campus/ 40 acre land purchase
  • One of the most efficient in the country
  • SSAE 16 (SOC I type II), PCI DSS, HIPAA, TIA 942 Class 4, LEED Silver*
  • High Performance Computing (HPC) capable, supports 250 wpsf with the ability to support over 1,000 wpsf
  • Capable of 250-1,000 watts per square foot
  • Low PUE < 1.25
  • Highly efficient power and cooling
  • Historically free of seismic activity, tornados, and hurricanes
  • Carrier-neutral, as well as dark-fiber connectivity option
  • 100% uptime service level agreement on power
  • 24x7 staffed NOCC and remote hands support
  • Dedicated cages and private suite options available

Contact Details
[email protected]
Ph: 1-855-OPTIC-10
Ph: 1-855-678-4210