HybridReseller
01-29-2005, 07:17 PM
We are thinking about moving our H-Sphere Control Panel server over from one datacenter to another. Both old and new servers will be online during the move and we would need the move to be as smooth as possible.
So, basically, we need the following:
CP Server Move
Smooth IP Migration (we will be switching to new IPs and cancelling the old server eventually)
We can install H-Sphere on the new server (that is not a big issue). We just want this move to be as smooth as possible. By the way, the old H-Sphere server is running FreeBSD and the new one is running RHE3.
Please send all quotes to h.lau@docketthost.com
Thanks!
So, basically, we need the following:
CP Server Move
Smooth IP Migration (we will be switching to new IPs and cancelling the old server eventually)
We can install H-Sphere on the new server (that is not a big issue). We just want this move to be as smooth as possible. By the way, the old H-Sphere server is running FreeBSD and the new one is running RHE3.
Please send all quotes to h.lau@docketthost.com
Thanks!
