Web Hosting Talk







View Full Version : He.net Direct as low as $18/Mbps! Now in AMS too!


lisllc
09-27-2004, 04:31 PM
He.net has broken the $20/Mbps barrier! Pricing has fallen and our network is still expanding! We are pleased to announce the opening of NIKHEF Amsterdam as a PoP for all our services. Nikhef is serviced by OC48 capacity into our international network. Also, let me say that he.net is dedicated to making solutions that work for our clients. If one of these promotions does not fit your needs, feel free to email me at rfishler@he.net, or call me at 1-800-845-0146 x122, and we will try to make something that will work for you, as some of our other pricing has gone down as well. That being said, feel free to take us up on one of the following:

He.net has 3 promos running currently:

1) Hurricane Electric is offering full 100 Mbps Internet connections for $2,000 per month out any he.net node(Including Fremont!). This service will be delivered over 100BT full duplex.

2) Dedicated Server Specials (Root or Fully Managed):

5 Mbps @ $100/Mbps Dedicated Server
2 Mbps @ $200/Mbps Dedicated Server

We have about 100 dedicated servers ready, each atleast 2 Ghz, atleast 1.5 GB RAM, 2 x 36 GB HD. No setup fee!

3) Hurricane Electric is now offering full (1000 Mbps flat rate) gigabit ethernet transit for $18,000/month at select locations.
This offer is available in Equinix Ashburn, Equinix San Jose, Equinix Chicago, Equinix Dallas, Equinix LA, Level 3 NY (111 8th Ave), Telehouse New York, PAIX Palo Alto, Hurricane Fremont (760 Mission Court, Fremont CA), Hurricane San Jose (55 South Market, San Jose CA), NIKHEF Amsterdam, and London Telehouse Docklands East. We are also more than willing to discuss other mutually beneficial locations.

We would be happy to work out a quote for your specific needs.
For more details, or for a quote, contact me at rfishler@he.net, or call at 1-800-845-0146 x122.

Reid Fishler
Director, East Coast Operations
he.net

JHServers
09-27-2004, 05:20 PM
How much are full cabinets with power?

lisllc
09-27-2004, 05:22 PM
In which location?

VapoRub
09-28-2004, 02:44 PM
Level 3 NY (111 8th Ave)
Telehouse New York
Equinix Chicago

Please provide pricing for those 3. =)

VapoRub
09-28-2004, 02:47 PM
Actually i wanted pricing for a cab / n power or racks if you have them.

quickred
09-28-2004, 03:27 PM
Is it also possible to deliver traffic to Telecity 2 or Redbus (both Amsterdam)?

lisllc
09-28-2004, 04:07 PM
Mihos-
This is possible, but there may be a slight additional charge. Contact me for more details. rfishler@he.net

lisllc
09-28-2004, 04:34 PM
Vapo-
For those locations, we suggest you contact the colo facility directly for racks. If you need contact details, feel free to email me. rfishler@he.net

Noam
09-29-2004, 02:07 AM
Its good to see you expanding your network, however there was no press release or news of this on your site -- this some early bird's special? :P

Also, will you be peering extensivly in the AMS-IX?

lisllc
09-29-2004, 02:30 AM
The PR is coming...the connection (OC-48) was just brought live, and we are awaiting AMS-IX turning our port up, which should be any day now...so I guess yes, this is a way WHT'ers can get in early!

Veiko
09-29-2004, 12:21 PM
I want to rent a cab in equinix in Chicago, can you give me a quote on price? You can pm me if you prefer.

Thanks

happy_jack
09-29-2004, 02:39 PM
Hi, I'm wondering if you do any plans by the U? I have 2, maybe 3, 2u machines I want to colocate in the Los Angeles area. Low bandwidth needs. Thanks

Rob T
09-30-2004, 02:23 AM
Reid,

Do you still have power limitations on your racks in Fremont? Last I heard you could not deliver more than 15amps per cabinet - if this has changed, i'll definitely be talking to you. My partner and I will be in the bay area next week, perhaps we'll stop by to chat. Email me if you would like to set something up.

qps
09-30-2004, 06:03 PM
Do you have Atlanta yet? I don't see it mentioned.

lisllc
09-30-2004, 06:06 PM
No, we are not in Atlanta yet.

lisllc
09-30-2004, 06:18 PM
Just a note that all of our cabinets include 15A of power. Ordering another 15A of power would get you the circuit, as well as another rack.