wluke
09-18-2000, 09:58 AM
I don't know if this is against the rules of these forums but I can't find a list of guidelines anywhere. If this is against the rules I am sorry, please let me know the appropriate place to post this.
<---- Message Begins ----->
I am doing some research. Myself and three partners need a minimum of 3 servers and possibly 4. These have to be fully customizable under either colocation or dedicated services.
Server #1 Requirements:
Windows NT 2000
800 MHZ Processor
Microsoft IIS 5
Microsoft Index Server
9+ gigabyte SCSI Drive
512 Megs of Memory
Server #2 Requirements:
Windows NT 2000
800 Mhz processor or Dual Processor Capable
Microsoft SQL Server 7+
27+ Gigabyte SCSI Drive Array
512 Megs of Memory
Server #3 Requirements:
Windows NT 2000 (Possibly Linux)
800 MHZ Processor or Dual Processor Capable
Proprietary Communications Software
Connection to External Leaseline from Wireless Provider.
9+ Gigabyte SCSI Drive
256 - 512 Megs of Memory.
Server #4 Requirements:
Windows NT 2000
Dual 650 MHZ Processors
Proprietary Server Software.
50+ Gigabyte SCSI Drive Array
1 Gigabyte of Memory.
Another possible configuration is to eliminate Server #4 and modify Server #2 to look like:
Server #2 Requirements:
Windows NT 2000
Dual 900 Mhz processor
Microsoft SQL Server 7+
Proprietary Server Software
80+ Gigabyte SCSI Drive Array
1.5 Gigabytes of Memory
Server Pathways:
Leased Line <-> Communications Server <-> SQL Server
SQL Server <-> Webserver
SQL Server <-> Proprietary Server <-> Web Server.
We also need a minimum of OC-48 connectivity to the Internet Backbone, Diesel Powered Back-Up Generator, Nightly Incremental Backups onto 30 Gigabyte tape, 24/7 monitoring and PCAnywhere connectivity. We would also need physical access to the machines to load software and data at rollout. Rollout is expected to be within 3-6 months.
Our wireless provider will most likely be either Bellsouth, Verizon or AT&T as they have the best United States Coverage at the moment.
If you know of anyone who can provide these services please let me know with a full quote by email.
<---- Message Begins ----->
I am doing some research. Myself and three partners need a minimum of 3 servers and possibly 4. These have to be fully customizable under either colocation or dedicated services.
Server #1 Requirements:
Windows NT 2000
800 MHZ Processor
Microsoft IIS 5
Microsoft Index Server
9+ gigabyte SCSI Drive
512 Megs of Memory
Server #2 Requirements:
Windows NT 2000
800 Mhz processor or Dual Processor Capable
Microsoft SQL Server 7+
27+ Gigabyte SCSI Drive Array
512 Megs of Memory
Server #3 Requirements:
Windows NT 2000 (Possibly Linux)
800 MHZ Processor or Dual Processor Capable
Proprietary Communications Software
Connection to External Leaseline from Wireless Provider.
9+ Gigabyte SCSI Drive
256 - 512 Megs of Memory.
Server #4 Requirements:
Windows NT 2000
Dual 650 MHZ Processors
Proprietary Server Software.
50+ Gigabyte SCSI Drive Array
1 Gigabyte of Memory.
Another possible configuration is to eliminate Server #4 and modify Server #2 to look like:
Server #2 Requirements:
Windows NT 2000
Dual 900 Mhz processor
Microsoft SQL Server 7+
Proprietary Server Software
80+ Gigabyte SCSI Drive Array
1.5 Gigabytes of Memory
Server Pathways:
Leased Line <-> Communications Server <-> SQL Server
SQL Server <-> Webserver
SQL Server <-> Proprietary Server <-> Web Server.
We also need a minimum of OC-48 connectivity to the Internet Backbone, Diesel Powered Back-Up Generator, Nightly Incremental Backups onto 30 Gigabyte tape, 24/7 monitoring and PCAnywhere connectivity. We would also need physical access to the machines to load software and data at rollout. Rollout is expected to be within 3-6 months.
Our wireless provider will most likely be either Bellsouth, Verizon or AT&T as they have the best United States Coverage at the moment.
If you know of anyone who can provide these services please let me know with a full quote by email.
